Belgrade, Serbia Branko's Bridge

 

Triposo is Your Smart Travel Guide

Discover and book hotels, restaurants and local experiences in 50,000 destinations worldwide. Triposo works offline so you can wander freely.

  

Save this to your mobile device

Branko's bridge is the second-largest bridge (after Gazela) of Belgrade, Serbia, connecting the city center with New Belgrade across Sava river.

Location

On the right bank, the bridge starts at the Sava Port, above the Karađorđeva Street, central street in the neighborhood of Savamala. The bridge is an extension of the Brankova Street, which delineates it from the neighborhood of Kosančićev Venac on the north and Zeleni Venac on the south. Through the Terazije tunnel, the Brankova connects it directly to downtown. On the left (western) bank, the bridge enters New Belgrade between the neighborhoods of Staro Sajmište, on the south, and Ušće, on the north. It extends into the Bulevar Mihajla Pupina which, passing between the Ušće Tower and Hyatt Regency Belgrade Hotel, connects it with New Belgrade and continues to the neighborhood of Zemun.

Name

Official name of the bridge during the communist rule was "Brotherhood and unity bridge" but that name never caught on. Citizens referred to it as the "Savski most" (Sava bridge), "Zemunski most" (Zemun bridge) and the "bridge in Branko's street", as the bridge is an extension of the Brankova street, named after Branko Radičević, Serbian romanticist poet. The latter name was colloquially shortened to Brankov most (Branko's bridge) and the name prevailed. Urban myth is that the bridge got its name after the writer, Branko Ćopić, committed a suicide by jumping from the bridge in 1984.

History

King Aleksandar Bridge, 1934-41 predecessor of Branko's Bridge

from Wikipedia by Author died more than 70 years Public domain

The bridge was built in 1956, replacing the former chain-stayed King Alexander Bridge that was opened on 16 December 1934 and blown up in 1941. The bridge actually uses lower parts of the former bridge's pylons (decorated by Ivan Meštrović with two couples of reinforced concrete in Serbo-Byzantium style) as outer constraints for its two secondary spans. It is 450m long, made as continuous steel box girder, with central span of 261m and side spans of 81m each. It is crossed by nearly 90,000 vehicles daily, and traffic congestions are frequent.
German company MAN is behind the original project of the bridge. Belgrade-based "Mostprojekt" company executed the project of doubling the bridge capacity in the 1970s. Head of the project team was Danilo Dragojević. Since the works were finished in 1979, the bridge has dual carriageway with three lanes in both directions and actually consists of two separate constructions in each direction.
In the Interbellum, the trams connected Belgrade to Zemun via King Alexander I bridge. After the war, in the 1950s, the general idea was that trolleybuses should take over the major role in the public transportation. Line to Zemun was opened in 1956, and in time three lines over the bridge were formed: Line 14 – Zeleni Venac-Gornji Grad (Zemun) (which was considered a successor line to the pre-war tram line), Line 15 – Zeleni Venac-Novi Grad (Zemun) and Line 16 – Zeleni Venac-Pohorska, New Belgrade. The lines were closed in 1973. However, as of 2017, over 25 bus lines of public transport crosses the bridge.

Present

The bridge gained an infamous reputation as the suicide bridge. Some 40 people try to commit suicide jumping of the Branko's Bridge every year.

2010s reconstruction

In the summer of 2013, the left pedestrian and bicycle path began to show signs of deterioration. Soon, the path was completely closed. City government for several years ignored the protests of citizens who wanted for the path to be repaired and open again. The administration claimed that there are no funds in the budget and that it appears the path can't be simply repaired. Instead, the entire left side had to be completely renovated. In the summer of 2015, Mayor of Belgrade Siniša Mali announced that city will fix the problem but the tender was announced in October 2016 and in November the "Mostogradnja" company was chosen.
In the late February 2017 a 210 million dinars contract was signed with "Mostogradnja". Mali claimed that the study was done in 2014 and that it showed the situation was worse than previously thought. However, only in June 2017, Mali announced "preparatory works". Deadline was set at 260 days since the beginning of the "proper" works. The repair began in early July 2017, four years after the path was closed, and the deadline was shortened to 180 days, but the mayor then shortened it even more, saying it will be finished by October or November 2017.
Mali also announced that three shifts will be organized. Still in August, a month later, it was obvious that not much was happening on the bridge. Mali said that the city displaced the permit, but after the criticism, reconstruction was fastened. Mali announced new deadline, end of 2017, but few days later again changed it to 2-2,5 months. Despite the speedup, by October it was obvious that the bridge will not be finished by the end of the year. That same month, city manager Goran Vesić announced that the bridge will be completely finished by the end of March 2018, or the originally planned 9 months. In the end, all lanes were open on 9 February 2018, but as of May 2018 the pedestrian paths were still not finished and operational.

Sources

Wikipedia, OpenStreetMap

Details

Branko's Bridge